STD STANDART+7 969 239-00-09Discuss my product
Menu
A quotation for your product

Certification costs: a clear scope before work begins

To calculate cost, we need to identify the product, procedure and scope of work. We discuss support, testing, samples and additional tasks separately, then agree the terms for your document package.

Accompanying documentsExample / STD

Why a product name is not enough for a price

A request for the “cost of an equipment certificate” may concern one machine, a model range or several different products. Their specifications, required documents and preparation scope differ. We first clarify the subject of the work so the proposal matches the actual task.

A description, model list, manufacturer, available documents and supply plan help us prepare a preliminary quotation. Indicate what is ready and what still needs to be obtained. Changes to the initial information should be clear before the final scope is agreed.

What the quote may include

The list depends on the product and agreed support. Some actions may be unnecessary or performed by another party. This is why the proposal should show the boundaries of each item as well as the total amount.

Part of the workWhat we clarify
Preparation and supportWhich materials we review and which documents we help prepare
TestingRequired scope, selected provider and working conditions
SamplesContents, quantity, preparation, handover and associated costs
Work under the schemeWhat actions the applicable procedure requires
Additional materialsTranslations, missing descriptions and other agreed tasks

How models, manufacturers and production format affect the work

The number of item codes does not by itself determine the number of documents. First, the product differences and the possibility of assessing them under the chosen procedure must be understood. A shared brand does not prove that all items can be combined.

A single batch and regular production also need separate discussion. Model conformity assessment schemes differ in applicability and required actions; the specific option is considered within the product requirements. We do not propose splitting or combining products in advance merely to produce a lower price.

How to compare two proposals

Ask both providers to quote for the same model list and the same starting conditions. Otherwise, a lower initial amount may cover less work. Compare the total for the task and separately identify costs that are still undetermined.

  • Which products and manufacturers does the quotation cover?
  • Are the necessary tests and their provider identified?
  • Who prepares and provides samples, and which related expenses are included?
  • Which additional work is agreed separately?
  • What will be delivered, and which actions remain the customer’s responsibility?
  • Are taxes, payment terms and conditions for price changes specified?

We agree cost and timing together

It is useful to tie a time frame to a specific event: receipt of a complete document package, approval of the brief or acceptance of samples. These are different stages, so a total number of days promised without conditions is of little help when planning a shipment.

Before work starts, we clarify dependencies: manufacturer responses, sample availability and the terms of the selected providers. If the task is urgent, tell us the date and reason in advance. Whether the necessary actions can be completed within that period is assessed against the actual scope.

How to request a quotation from STD STANDART

Send the product name and intended use, models, manufacturer, country of production and shipment description. Attach the materials you already have and state the desired outcome. You can start with a product list or supplier link.

After clarification, we agree the support scope, participants, cost and terms. Where needed, we coordinate with accredited laboratories. We do not present our own price list as a universal cost of mandatory procedures or promise a positive outcome before they are completed.

Frequently asked questions

Can you give an exact price from a photograph immediately?

A photograph helps start the discussion, but an accurate proposal usually requires specifications, models, manufacturer details and production or shipment conditions. We will request specific missing information.

Is testing included in the support fee?

This should be clear in the agreed proposal. We specify the scope and the terms of laboratory coordination separately so that different costs are not mixed together.

What if the product list changes?

Report changes before work continues. We will compare the new list with the agreed scope and discuss whether the terms need adjustment.

Official sources

Requirements apply to specific products, taking into account the current versions of the documents and their amendments.

What to compare before choosing a provider

We compare the models covered, testing, documents and conditions. If the proposals are comparable, we will check whether we can offer a lower price.

  • Which products, models and manufacturers are covered.
  • Which tests are included, who performs them and how samples are handed over.
  • Who prepares documents, handles feedback and charges separately for additional work.
From general rules to your product

Let’s start with what you have.

Send a product description, a photograph of markings or supplier documents. We will clarify the initial information and further scope.

Prepare enquiry
Mikhail / STD

A question about your shipment?

Send a product description or a photo of its label. We will identify the next step together.

Contact Mikhail+7 969 239-00-09