What the document covers
The EEC model schemes include options for serial production, a batch and a single item. These are different assessment objects. The number of boxes or shipments alone does not determine the right option: the product and its production or supply conditions must be identified.
Start by asking what needs to be established. Are repeat shipments from one manufacturer planned, or is there a defined quantity of goods under transaction documents? Is the required production information available? These details enable a practical discussion of an eligible scheme.
| Assessment object | What to establish |
|---|---|
| Serial production | Manufacturer, products, models, production and applicable scheme |
| Batch | Contents and identification of the specific batch and its documents |
| Single item | Identification of the individual item and eligibility for the selected scheme |
Check the applicant’s role
Eligible applicants are determined by the relevant scheme and applicable technical regulation. Do not assume any seller can complete every procedure. For imported products, the relationship with the overseas manufacturer and documents establishing authority, where required, need separate review.
State who is making the enquiry: a manufacturer, importer, seller or authorised representative. If no agreement with the manufacturer has been signed yet, tell us before the work is agreed. This helps avoid selecting a route that requires documents the applicant does not have.
How the assessment option affects preparation
Standard schemes differ in more than the document name. Depending on the scheme, they may involve testing, production assessment, production control and subsequent product assessment. The need for these elements and the specific procedure are checked against the requirements for the product concerned.
The question “which is cheaper—serial production or a batch?” cannot be answered without initial information. The model range, availability of manufacturer documentation, samples, necessary testing and other procedural work must be considered. Compare proposals with the same scope, not only their totals.
Assumptions that can lead to the wrong choice
A common mistake is to assume a serial-production document covers every product of one brand. Check the specific product, manufacturer, models, annexes and conditions of use. A batch document cannot automatically be applied to the next shipment simply because the name is similar.
Do not assume serial-production assessment always means a five-year document, or that a batch is necessarily cheaper and faster. Timing and scope depend on the applicable requirements and circumstances. If the manufacturer, product or shipment contents change, first assess whether this affects the existing document.
- Do not choose a scheme solely by its validity period.
- Do not assume one brand means one manufacturer.
- Do not overlook annexes listing the models.
- Do not apply a conclusion about one product to the entire purchase.
What to prepare for selecting a scheme
For an initial review, describe the product and supply plan. Mark any unknown information: we can help prepare questions for the manufacturer and assessment participants. After analysis, we can discuss the form, scheme, required package and scope of work.
STD STANDART helps prepare information and coordinate the next steps with the appropriate parties. A certification body issues a certificate within its competence; the applicant adopts a declaration under the established procedure. Consultation and document collection do not replace those decisions.
- Product name, intended use, models and technical description.
- Manufacturer and country of production.
- One-off or repeat supply, quantities and transaction documents.
- The proposed applicant’s role and relationship with the manufacturer.
- Available test reports, certificates, declarations and annexes.
Frequently asked questions
Can a batch document be used for the next purchase?
Not automatically. You need to check which batch the document identifies and whether the goods in question belong to it.
Is a serial-production scheme always needed for repeat shipments?
There is no universal answer. Product requirements, the applicant’s role, supply conditions and availability of necessary documents must all be considered.
Can I find out the cost first?
Yes, after an initial review of the information. To prepare a comparable quotation, we need to identify the anticipated procedure and the included work.
Official sources
- EEC: model certification schemes under EEC Council Decision No. 44 of 18 April 2018 ↗
- EEC: model declaration schemes under EEC Council Decision No. 44 of 18 April 2018 ↗
Requirements apply to specific products, taking into account the current versions of the documents and their amendments.
Let’s start with what you have.
Send a product description, a photograph of markings or supplier documents. We will clarify the initial information and further scope.
Prepare enquiry